Eybesfeld Outdoor Pool

Freischwimmbad Eybesfeld 15
Freischwimmbad Eybesfeld 03

Year

2003

Venue

Jöss

State

Completed

Category

Private

Size

15.25x6.75m

Year

Venue

State

Category

Size

2003

Jöss

Completed

Private

15.25x6.75m

Year

2003

Venue

Jöss

State

Completed

Category

Private

Size

15.25x6.75m

The original plan for Eybesfeld Castle was to provide a new base and an integration into the landscape by a surrounding loop in exposed concrete. This loop should comprise living, secondary functions as well as an indoor swimming pool.

Freischwimmbad Eybesfeld 04
Freischwimmbad Eybesfeld 06
Freischwimmbad Eybesfeld 12
Freischwimmbad Eybesfeld 11

This project was split up later on in two single projects: a living landscape on the ground floor of the castle and a pool area located outside of the former castle wall near the corner tower in the park: a spread out blanket in polyester.

Freischwimmbad Eybesfeld 07
Freischwimmbad Eybesfeld 10
Freischwimmbad Eybesfeld 09
Freischwimmbad Eybesfeld 08

Pool, entry- and sunbathing areas, playground, seat ramp and sun deck are interpreted as zones of one single body lying in the lawn, coated homogeneously with polyester or polyurethane respectively. Below ground level where this figure folds up from the lawn emerge changing cubicles and a shower room arranged as a mere glass structure underneath the cantilevering concrete structure. The surfaces of the pool entry and the seat ramp have an undulating shape in such a way as to achieve anatomically formed seat and lying hollows.

Freischwimmbad Eybesfeld 01
Freischwimmbad Eybesfeld 02
Freischwimmbad Eybesfeld 17
Freischwimmbad Eybesfeld Modell 01

Architecture

Pichler & Traupmann Architects

Project team

Sandra Riess

Wolfgang Windt

Client

Christine und Bertran Conrad-Eybesfeld

Structural design

Manfred Petschnigg, Graz

MEP engineering, pool engineering

PKG, Graz

Schartel, Schwimmbad & Wellness, Graz

Lighting design

Klaus Pokorny, Vienna

Landscape design

West 8, Rotterdam

Site supervision

Gerhard Kordon, Graz

Josef Fritz, Graz

Hard facts

Start of planning: 2003

Start of construction: 2005

Completion: 2009

Location: Jöss/Lebring, AT

Function: Pool: 15,25 x 6,75 m

Photographs

Paul Ott, Graz